• Railway bridge, Nordre Älv
  • Railway bridge, Nordre Älv
  • Railway bridge, Nordre Älv

Railway bridge, Nordre Älv

  • Type: Railway bridge
  • Year: 2002
  • Weight: 30 tons

The replacement of rails and fastenings on Nordre Älv Bridge was conducted at night, with the train stop at about 6 hours per hanger pair. The material in the attachments and spades are 40mm stainless duplex.