• Railway bridge, Göteborg
  • Railway bridge, Göteborg
  • Railway bridge, Göteborg

Railway bridge, Göteborg

  • Type: Railway bridge
  • Year: 2003
  • Weight: 90 tons

Replacement of railway bridge over Stensån in Gothenburg. The delivery included the demolition of an existing design, prefabrication of the new steel bridge and precast concrete for abutments. Bridge replacement was performed during a train stop for five days.